For any engineering project, countless hours go into 3D modeling, prototyping, and refining the design. Often, the final step is to prepare your designs for the injection molding process, but where do you start?
Are you interested in learning more about china 2k injection molding? Contact us today to secure an expert consultation!
How long will it take to go from the initial part designs to your first molded parts? This is a long and complicated process that can intimidate many an engineer.
In this article, well walk you step by step through the injection molding process from start to finish and share with you the strategies we use with our customers to help save time and avoid potential pitfalls common to this complex manufacturing process.
One of the key tools our technical program managers at Fictiv use to keep injection molding programs on track is a detailed gantt chart.
This article will go deep into each of those gantt chart steps to help you understand the process. Plus, were making our template available for you to download for free here, which you can use to plan out your own program.
The example timeline in the gantt chart is based on the sample part shown below using a single cavity mold. The overall part size is 95.520 x 55.541 x 16.500 mm, made of a general-purpose PC/ABS plastic thats black and has a matte SPI-B1 finish. The tooling will be made from P20 steel, with a cold runner and automatic side action.
With Fictiv, you can get T1 samples for an injection molded part like this in 12 business days, which is the timeline well anchor around for the purposes of this article.
If youre working with a traditional injection molding supplier, that timeline will typically be about twice as long (this is included in the downloadable template for your reference).
Now, lets dive into the process!
The first step of the process is to finalize your designs for injection molding, which encompasses the part as well as the mold design.
Its common practice in the industry for molding suppliers to hold back design for manufacturability (DFM) feedback until after an order is placed. But this is where the most time in a project can be lost.
Typically design engineers move onto new projects once an order is placed, which leaves limited resources for any injection molding design corrections should there be issues or concerns (which is common).
Additionally, the longer you wait to make design adjustments, the more likely it is that your team may have limited flexibility to make changes based on other parts in the assembly.
Thats why we recommend customers engage early on in the process to start optimizing their designs for injection molding, which can take significant time. For more tips here, check out our Injection Molding Design Guide.
The initial phase of mold design involves laying out the part and deciding how it will be oriented when its being molded. This layout provides useful information about mold size and the corresponding steel block required to create the tooling.
Its especially critical to know the size of the steel block because that way your supplier can order and ship the steel before the design of the tool is finished.
Example injection moldOnce the steel arrives, initial work starts to prepare the steel for machining. The steel blocks need to be faced off so that all edges are perpendicular to each other and have a smooth surface to begin machining. This step can take 2-3 days and is needed before the CNC machining can begin.
At Fictiv, our partners buy steel thats ready to machine, which is more expensive but saves days of prep time.
The next phase of mold design is to flesh out details like finalizing the design of the core and cavity and building a complete BOM (bill of materials) with all of the small parts and other components needed. After creating a 3D CAD model of the mold, (which takes one to two days depending on the size and complexity of the part) the 2D drawing is completed in another day or two.
By working on different aspects of the mold in parallel, the mold creation process becomes a good deal more efficient by 5 or 6 days when compared to a more linear approach.
Finally, once the part design is confirmed, CNC programming begins, while the cooling lines and ejector pin holes are drilled. A CAM (computer-aided manufacturing) program is used to develop the G-code that will run the machine to make the mold parts. This milling process takes about two days and can begin once the DFM is approved and 3D CAD modeling starts.
As the mold design is finalized and the CNC programming progresses, its time to start preparing other materials. If youre working with Fictiv, at this point the steel for the core and cavity inserts for the mold base has already been ordered and typically arrives in a couple of days.
In this step, its a good idea to spend a little extra to get core and cavity inserts that are already the exact sizes you need it saves time that would otherwise be spent grinding it down to get the right fit. Those sorts of adjustments can take days you cant afford when your development cycle is on a tight deadline.
Once the CNC programming is done, its time to order the copper material for any EDM (electrical discharge machining) required by the design. This copper will be used to make the electrodes for sinker EDM.
Mounted injection mold and pressThe next material to prepare is the mold base. A mold base encloses the core and cavity parts of the mold itself and helps absorb the pressure from the injection process. The mold base is often made of a softer steel than the core and cavity because its cheaper than the harder steel used for those inserts.
And while were on the subject of mold bases, lets talk about the interchangeable sort. Mold bases are often made in standard sizes that can hold a number of different mold cores and cavities. If you have a mold base available that was used for other projects, then you dont need to spend the time or labor to make a new one. Some minor adjustments to that existing base may be needed, but overall, using an interchangeable base saves you a lot of time.
To finish off the mold materials list, the next step is to source all of the required off-the-shelf components like screws, nuts, and bolts plus anything else thats on the BOM and hasnt been obtained yet. This is also the time to order the plastic material.
Fictiv manufacturing partners stock general-purpose grades of plastic that are used most often and obtain other plastics from approved suppliers as needed.
If the plastic you need is a specialty grade, Fictiv can source it for you. However, specialty-grade plastics can have longer procurement lead times and arent always available. Additionally, it takes longer for specialty plastic material to arrive than it does to machine the mold. So, its critical to determine early on if youre going to use a specialty grade of plastic and consider ordering it before the part designs are finalized and the tooling order is released.
Once the material arrives, its time to start machining the mold. The core and cavity are machined from the prepared steel blocks, and the process starts with rough CNC machining using larger cutting tools to cut a rough outline.
Some manufacturers use less accurate (and therefore less expensive) machines to do this rough machining before moving the inserts to a high-precision machine. However, in recent years CNC machines have become more precise and less expensive, so the cost savings from using different machines to do rough and finishing cuts are now minimal.
Our manufacturing partners combine the rough and finish machining into one step and do both on the same machine, so they can make the cavity, core, and lifter/sliders in only a few days.
Machining itself for the Gantt chart sample part doesnt take too long, less than one day. This method, combined with our program managers overseeing the schedule, also avoids time lost from the steel sitting in a queue waiting to be machined.
The copper blocks are also machined at the same time as the steel to ensure the EDM electrodes are available immediately to complete the mold.
After CNC machining the finer details into the mold components, the final touches are made to the geometry. This requires electrical discharge machining (EDM) to achieve certain geometries that cannot be created with a CNC mill. For example, wire EDM is used to cut gear teeth with sharp internal corners and square holes.
For more information, please visit china aluminum mould suppliers.
Then the cavity, core, lifters, sliders, and inserts go through the sinker EDM process using the machined copper electrodes.
Sinker EDM creates super fine details like text or internal features that are difficult or impossible to make with a CNC machine.
For this sample part, the cavity does not require as much EDM as the core side, so once finished, the cavity side can move directly to polishing to save time while the core machining continues.
Once the mold cavity, core, and other parts have been machined, its time to move onto the finishing touches, so we can actually manufacture some parts!
First, a fit check is in order. The two halves of the mold, the core, and cavity, are brought together to make sure they line up perfectly because any misalignment could result in flash or parting line mismatch. At the same time, some precision grinding is done on the mold parts to ensure that everything fits and meets the tight tolerances required.
After confirming that all the pieces fit well, the next step is to give the mold the right finish. This often means polishing it to a specified level of smoothness, or adding different textures when required. Whether or not the end goal is a polished surface finish, some polishing is always required to remove machining marks and provide a smooth surface upon which to add textures.
Finally, its time to assemble the mold and bring together the mold core and cavity, any sliders, lifters, or inserts, and the nuts and bolts that connect it all.
Assembly is usually done in the same 24 hours as the precision grinding, mold fitting, and polishing. Typically, Fictivs partners complete fitting by day and polishing by night.
Now, its time to shoot some plastic!
The first parts made with a mold are called T0 parts, and they show how the mold and all of the press parameters are working.
T0 parts are inspected for quality and indicate if any final adjustments to the mold or modifications in the press parameters are needed. For a small part, these tooling adjustments can be done in one day, while dialing in the mold for medium or larger parts takes two days.
The next parts to be shot are the T1 parts, which are usually the first parts to be shared with the customer.
Once the mold is loaded in the press, Fictivs supplier quality engineers and manufacturing partners continually monitor the process to ensure its delivering the quality you need.
Hopefully, you now have a better understanding of the many steps that go into creating a mold to manufacture your injection molded parts!
For the fastest lead time, remember 3 key strategies:
Combine those strategies with our Gantt chart template, and you can craft an efficient production plan for your next injection molding project.
If you dont want to project manage all those steps yourself, our team at Fictiv can help!
Every Fictiv injection molding quote comes with a free DFM report and transparent pricing. Once your order kicks off, our team of program managers and quality engineers will ensure you get fully-inspected, high-quality parts in-hand, delivered on time, according to our rapid production timelines.
You can learn more about our injection molding capabilities here and then create your free Fictiv account to request a quote!
I remember when I was starting out as a young molding technician any information I could find either online or in print I would try to take in and learn as much as possible to understand the world of Injection Molding. When I first started many topics were over my head as there is a process to learning best practice and procedures to manufacture quality parts time and again and to make that repeatable every time.
Today we will focus on getting back to the basics of injection molding. This blog will focus on the injection molding cycle, and what it entails.
Assume the injection molding machine has just completed a full cycle and the operating sequence is starting from there:
In some cases if there is a sprue break employed then the injection unit or carriage moves forward and seats against the sprue. In other cases there is no need for a sprue break and the injection unit retains a constant pressure against the sprue and stays in place throughout each cycle.
4-First Stage Injection
The screw pushes forward at a set injection speed and pressure pushing the melted plastic (the shot) that sits in front of the check ring and nozzle. This shot size was previously metered out during the last cycle.
5-Pack and Hold
When the screw reaches the transfer position you go from first stage injection to second stage injection which is your pack and hold. This is where you change from velocity control to pressure control. When the transfer position is reached most of your cavities will be filled with plastic (more than 95% filled) and the lower pack pressure and hold time will fill the parts the rest of the way out. Note: you never want the screw to bottom out or use all of the plastic that is in from of the nozzle, the amount of plastic left in from of the nozzle at end of fill is known as the cushion and this is vital to ensuring repeatable quality parts.
6-Cooling
During the cooling time, a number of things are happening at the same time. Cooling allows the heat from the molded parts to dissipate as cooling channels in the mold run cool fluid around the cavities and draw heat away from the molded part to create the finished product.
7-Screw Rotation
While the cooling process is in effect, the screw rotates and plasticizes the next shot. When the screw turns the check ring slides forward which opens up melt channels for the melted plastic to flow in front of the screw. When the screw pushes forward in the earlier cycle the check ring closes shut to not allow any resin to pass behind the check ring. The screw continues to turn until the shot size is reached and then if there is decompression applied that takes place as well.
8-The Mold Reopens
Once the cooling time has expired, the mold opens to a set position with the finished parts carried out on the B side of the mold holding onto the cores.
9-The Part Ejects
Once the mold opens to the desired position, the parts are ejected off the cores and the next cycle can begin. On many machines the butterfly plate moves forward pushing the ejector pins out which eject the parts. The parts could fall onto a conveyor, be picked by a robot, or be picked off the mold manually by an operator. There are also different designs that could come into play with stripper plates and horn pins. There are a wide variety of mold designs which could change this process some but for the majority this holds true.
For more china mold injected plastic factoryinformation, please contact us. We will provide professional answers.