VCEN Products applicable medium
Afbv Valve supply professional and honest service.
Heat conduction oil permeability is extremely strong medium: temperature range - 29-400 , prevent closed system of medium loss and environmental pollution;
Vacuum system: packing for special occasions, strictly to prevent air flow backward cause pipe vacuum failure
Steam kind of medium, prevent leakage cause heat loss and safety accident;
Chlorine, hydrogen, HF acid, phosphates, ammonia water poisonous medium: prevent medium leakage cause pollution of the environment and safety accident.
VCEN Product DIN standard of the design-Bellow seal globe valve
Design standard ENEN.
Bellows design standards MSS SP117.
Face to face with standards EN558-1.
Flanged with standardsEN-1
Butt welded with standards EN.
pressure-temperature rating EN
Test with standardsEN
VCEN Product ANSI standard of the design-Bellow seal globe valve
Design standard BSAPI602.
Bellows design standards MSS SP117.
Face to face with standards ASME B16.10.
Flanged with standardsASME B16.5.
Butt welded with standards ASME B16.25.
pressure-temperature rating ASME B16.34.
Test with standardsAPI598,API6D
VCEN Product ANSI standard of the Design-Bellow seal gate valve
Design standard API600API6DAPI602.
Bellows design standards MSS SP117.
Face to face with standards ASME B16.10.
Flanged with standardsASME B16.5.
Butt welded with standards ASME B16.25.
pressure-temperature rating ASME B16.34.
Test with standardsAPI598,API6D
Bellow sealed globe valve
User manual
1.0 General information on operating instructions
These operating instructions provide information on mounting and maintaining the fittings. Please contact us in case of problems which cannot be solved by reference to the operating instructions.
They are binding on the transport, storage, installation, operation, maintenance and repair.
The notes and warnings must be observed and adhered to:
- Handling and all work must be carried out by expert personnel or all activities must be supervised and checked.
It is the owners responsibility to define areas of responsibility and competence and to monitor the personnel.
- In addition, current regional safety requirements must be applied and observed when taking the fittings out of service as well as when maintaining and repairing them.
The manufacturer reserves the right to introduce technical modifications at any time.
These Operating Instructions comply with the requirements of EU Directives.
2.0 Notes on possible dangers
2.1 Significance of symbols
2.2 Explanatory notes on safety information
In these Operating and Installation Instructions dangers, risks and items of safety information are highlighted to attract special attention.
Information marked with the above symbol and ATTENTION! describe practices, a failure to comply with which can result in serious injury or danger of death for users or third parties or in material damage to the system or the environment. It is vital to comply with these practices and to monitor compliance.
All other information not specifically emphasised such as transport, installation, operating and maintenance instructions as well as technical data (in the operating instructions, product documentation and on the device itself) must also be complied with to the fullest extent in order to avoid faults which in turn can cause serious injury to persons or damage to property.
3.0 Storage and transport
ATTENTION!
- Protectagainst external force (like impact, vibration, etc.).
- Valvemountings such as actuators, handwheel, hoods must not be used to take external forces.
- Suitable materials handling and liftingequipment should be used.
-The valve shall bestored indoor with dry and well-ventilated environmentat -20°C to +65°C., the ends of the port shall be plugged by covers.
-The valve stored foralong time shall be checked periodically and cleaned to be free from stainEspecially clean thesealing ring to protect sealing surface against damage, and coatcorrosion
-resistant oil on the machined surface.
-If the stored timeexceeds 12 monthsthevalve shall be tested to ensure structural and functional integrity. A recordis needed.
-The paint is a base coat to protect againstcorrosion during transportation and storage. Do not damage paint protection.
4.0 Description
4.1 Scope of applications
Valves are used for shut-off and/or throttling of medium.
-This series valves are designed and manufactured in accordance with EN.
-The relevant standard is as follows:
-EN-1 Industrial valves, testing of valve, pressure tests, test procedures and acceptance criteria. mandatory requirements
-EN-2 Industrial valves, testing of valve, pressure tests, test procedures and acceptance criteria. Supplementary requirements
-EN 558-1 Industrial valves-face-to-face and centre-to-face dimensions of metal valves for use in flanged pipe systems-part 1:PN-designated valves
-EN Industrial valvebutt welding ends for steel valves.
-EN Flanges and their joints-circular flanges for pipes. valves. fittings and accessories, PN designated-part 1:steel flanges
-MSS-SP 117 Bellows Seals for Globe and Gate Valves
ATTENTION!
-Refer to the data sheet for applications,limits on use and possibilities.
- Certainmedium require or preclude the use of special materials.
- The valves are designedfor standard operating conditions. If conditions exceed these requirements,e.g. aggressive or abrasive medium, the operator should state the higherrequirements when ordering.
The information complies to the Pressure Equipment Directive 97/23/EC.
It is the responsibility of the machine planner to ensure compliance.
The special markings on the valve must be taken into account.
Refer to the catalogue sheet to see which materials are used in standard versions.
Please contact the manufacturer if you have any questions.
4.2 Operating principles
-The valve is closed by turning the hand wheel clockwise.
ATTENTION!
Do not use the unsuitabletools to increase the torque on the handwheel.
-The valve stem is sealed by a bellow and an outer safety stuffing box.the packing is PTFE or graphite.
-Tighten the safety stuffing box if required.
4.3 Diagram
4.4 Technical data
-Material list(see fig. ):
Table3.Material specification-DN15-DN200
POS
Detail
carbon steel 3EO
Alloy steel 5EO
stainless steel
-10 till 400
-10 till 530
-20 till 200
1
Body
GS-C25(1.)
1.(WC6)
CF8(1.)
CF8M(1.)
2
Disc
C22.8
1.(WC6)
F304
F316
Seat
13Cr
Stelite
17Cr
Stelite
17Cr
Stelite
18Cr
Stelite
3
Pin
SS304
SS304
SS304
SS304
4
Pin
X20Cr13
X20Cr13
F304
F316
5
Gasket
SS304+Graphite
SS304+Graphite
SS304+Graphite
SS316+Graphite
6
Bellows
SS304
SS316L
SS304
SS316L
SS304
SS316L
SS316L
7
Bolt
ASTM A193 B7
1.
ASTM A193 B8
ASTM A193 B8M
8
Nut
ASTM A194 2H
1.
ASTM A193 8
ASTM A193 8M
9
Bonnet
GS-C25(1.)
1.(WC6)
CF8(2C1)
CF8M(2C2)
10
Packing
Graphite
Graphite
Graphite/PTFE
Graphite/PTFE
11
Gland Nut
X20Cr13
X20Cr13
F304
F316
12
Guide
C22.8
C22.8
F304
F316
13
Pin
CK25
CK25
F304
F316
14
Stem nut
GGG40.3
GGG40.3
GGG40.3
GGG40.3
15
Lock nut
CK22
CK22
SS304
SS304
16
HandWheel
C22.8
C22.8
C22.8
C22.8
17
circlip
65Mn
65Mn
SS304
SS304
18
Nozzle
SS304
SS304
SS304
SS304
- Principal dimensions(see fig. ):
DN
L
H
(close)
Stroke
Weight(kg)
Kv
Pn16
Pn25
Pn40
15
130
200
8
4
4
4
4.6
20
150
205
8
4.6
4.6
4.6
8.0
25
160
210
10
5.5
5.5
5.5
13.2
32
180
215
10
7
7
7
21.0
40
200
225
15
9
9
9
33.0
50
230
230
15
11
11
11
51.0
65
290
245
18
15
15.5
15.8
83.0
80
310
270
22
19.8
21.5
21.8
Contact us to discuss your requirements of DIN Bellows Seal Gate Valve. Our experienced sales team can help you identify the options that best suit your needs.
133.0
100
350
340
28
33.2
37.1
37.5
205.0
125
400
380
33
48.6
55
55
315.0
150
480
430
40
67.2
78
78.5
454.0
200
600
575
55
121.50
145
154
780.0
250
730
730
65
228
245
265
.0
300
850
800
80
369
388
410
.0
350
980
940
95
610
660
690
.0
400
125
800
850
870
.0
- Pressure-temperature-ratings:
Material:1.
PN
RA
50°C
100°C
150°C
200°C
250°C
300°C
350°C
375°C
400°C
16
15.6
14.9
13.6
12.7
11.4
10.4
9.4
8.8
8.6
8.4
25
4.4
23.2
21.3
19.8
17.8
16.2
14.7
13.7
13.5
13.2
40
39
37.2
34.1
31.7
28.4
26.0
23.5
21.9
21.6
21.1
According to EN
4.5 Nameplate & marking
-Details on the valve:
5.0 Installation
5.1 General notes on installation
The following points should be taken into account besides the general principles governing installation work:
ATTENTION!
- Remove flange covers if present.
-Assurethe packing does not hamper the movement of the stem before installation.
- The interior of valve and pipeline must befree from foreign particles.
- Note installation position with reference toflow, see mark on valve.
- Steam line systems should be designed toprevent water accumulation.
-If the pipeline hasenough strength to resist the valve weight and the operation torque, thesupport isnt needed. Otherwise, the valve should have support point.
- Protect valves from dirt during constructionwork.
- Connection flanges must mate exactly.
- Valve mountings such as actuators, handwheel,hoods must not be used to take external forces,
- Suitable materials handling and liftingequipment should be used.
- The best installed position ishorizontaland stem isvertical.
- The valve must befully open during pressure testing of the pipeline system after installation.
- Planners / construction companies or operators are responsible for positioning and
installing products.
-The valves are designed for application, not influenced from weather.
- For application outdoor or in adverse environments like corrosion-promoting conditions(sea water, chemical vapours, etc.), special constructions or protective measures are recommended.
-Bellow seal out of media flow path. Especially for pulsating, turbulent flow directly behind
pumps, elbows, junctions etc.
5.2 Installing valves with butt weld ends
-Please note that only qualified persons using appropriate equipment and working in accordance with technical rules are allowed to install fittings by welding.
-The responsibility for this lies with the system owner.
-The valves must be welded in closed position.
5.3 Installing valves with pressure balancing plugs
ATTENTION !
-The stop valves must beequipped with pressure balancing plugs if the differential pressures listed in the table(FIG.5)below are exceeded in theclosed state.
-Valves with pressurebalancing plugs should be installed so, that the pressure ofthe medium acts onthe plug(pos. 3)and the stem is verticallyupright.
-Valves with pressure balancing plugs have to be installed with medium flowing over the plug (pos. 3) as indicated by flow direction arrow on valve body.
-Working principles:
When the valve is closed, anticlockwise rotation of the hand wheel lifts the pilot plug (pos.3.1) off the larger balancing plug (pos. 3). This allows the medium to pass through the plug and equalizes the pressure of the medium under the plug (pos. 3). After the pressures have been equalized within the values stated in the table below, the valve can be opened by turning the valve further.
FIG.5
Balancing plug
DN
125
150
200
250
300
350
400
Prossure drop
ΔP
25bar
21 bar
14 bar
9 bar
6 bar
4.5 bar
3.5 bar
- Pressure balancing plugs are fully effective only in closed line section.
- The pressures of the medium on either side of the plug cannot be equalized if the medium is discharged into open air.
- If adequate pressure equalisation cannot be achieved using a pressure balancing plug, other design solutions must be used instead (e.g. a bypass line).
5.4 Installation data on valves with loose plugs
The data given in point 5.3 applies to the maximum differential pressure. The set pressure
is 0,05 bar. The valve should only be installed in horizontal lines in an upright position.
6.0 Putting the valve into operation
-Before putting the valve into operation, checkmaterial, pressure, temperature anddirection of flow.-Regional safety instructions must be adhered to.
-Residues in piping and valves (dirt, weld beads, etc.) inevitably lead toleakage.
-Touching the valve when it is operating at high (> 50°C) or low (< 0°C)media temperatures can cause injury.
-Beforeputting a new plant into operation or restarting a plant after repairs ormodification, always make sure that:
- All works has been completed!- The valve is in the correct position for itsfunction.
- Safety devices have beenattached.
7.0 Care and maintenance
Maintanance and maintenance-intervals have to be defined by the operator according to the requirements.
-Observe safety instructions.
- Keep the stem well greased.
ATTENTION!
-Pay attention, thelubricant must be suitable for the medium.
- If the stem (pos. 4.2) starts leaking, tighten the bolted gland (pos. 12) until leaking stops (Fig. 7). Replace bonnet at earliest opportunity.
ATTENTION!
-Retighten the stuffing box packing if required and re-pack it in good time.
-For safety reasons werecommend that valves only be repacked when depressurised.
-Replace stuffing box packings only after the systemhas cooled down and the pressure in the plant has been relieved.
In the case ofcorrosive or aggressive mediums, drain and ventilate the valve before replacingthe packing.
-Dismantling the valve or the top part
ATTENTION !
Thefollowing points must be observed:
-Pressureless pipe system.
- Medium must be cool.
- Plant must be drained.
- Purge piping systems incase of caustic, inflammable, aggressive or toxic medium.
-Mounting of the bonnet:
- Before reassembling the unit, remember that the bearing surface must be cleaned and 2 new gaskets (pos. 9) must be inserted.
- Set the cover in place.
- Tighten the hexagon nuts evenly crosswise.
- Tightening nuts / screws.
8.0 Guarantee
Guarantee period of valve is 12 months after using, but not exceed 18 months after delivery.
Manufacturer will repair or provide spare parts free of charge on the occurrence of damage due to material, Manufacturer or the damage occurred at correct operation condition during the guarantee period.
9.0 Troubleshooting
-In the event of malfunction or faulty operating performance check that the installation and adjustment work has been carried out and completed in accordance with these Operating Instructions.
-If malfunctions cannot be eliminate with the help of the following table ,the supplier or manufacturer should be consulted.
Bellow seal globe valveTroubleshooting table
fault
Possible cause
Corrective measures
No flow
Valve closed
Open valve
Flange covers not removed
Remove flange covers
Little flow
Valve not sufficiently open
Open valve.
Dirt sieve clogged
Clean / replace sieve.
Piping system clogged
Check piping system
Valve difficult to move or cannot be opened
Stem dry
Grease stem
Wrong direction of rotation
Turn in correct direction
Lubricating nipple / locking screw tightened
Loosen lubricating nipple / locking screw
Valve stem leaking
Bellows seal damaged
Replace top of bellows seal at earliest opportunity!
Gland screw slack
Tighten gland screw until leakage stops; Replace bonnet at earliest opportunity!
Leakage across valve seat
Valve not properly closed.
Pull hand wheel tight without tools
Seat / plug) damaged by foreign particles
Replaced valve or rework sealing surfaces
Pressure difference too high.
Use a valve with pressure balancing plug
Medium contaminated
(suspended solids).
Clean valve;
Install a strainer upstream of valve
Flange broken between valve and piping
Bolts tightened unevenly;
Mating flanges not properly aligned
Re-align piping and fit new valve
FAQ
1 Are you a factory or trading company?
We are a factory specialized in manufacturing valves and ftting over 10 years.We have our own stainless steel foundry in Fujian province.
And we have got ISO&TS certificate of Manufacturing and processing of valves and fttings.
2 Where are the main markets for your products?
We hope to make business with companies from all over the world. And for now, our valves and fttings have
Been exported to especially in North America, South America, South Asia, Europe and Middle East.
3 Do you have a minimum quantity of the products?
No, we will build business with you with even 1PC. We believe this cooperation will be a long- term relationship for our high quality, competitive price and good after-sale service.
4 Are samples available to be sent with free?
It depends on what product you need. There are hundreds of products we sell. You can contact us for particular answer.
5 Can you print our Logo on the valves?
Yes, we can totally produce products according to your special request, even manufacture it base on your drawing.
6 What is your lead time?
It's around 15 days normally. If we have the products in stock, it will be about one week.
7 what is your payment term?
T/T 30% down payment, balance to be paid before shipment.
8 How can I check your factory situation w hile it's difficult for me to come to China?
We have photos and videos on our website and facebook, It shows every step of the manufacturing.
9 How can you guarantee the quality of products?
Firstly, we have the numerical control device to manufacture products accurately. Then our quality inspectors will test products one by one to make sure every valve or ftting we sell is qualified and release the test mill certificate. If possible, We can also send you the sample for checking. Regarding the details, we can discuss if you want to know more about it.
Jacky
ZHEJIANG LONGGONG VALVE TECHNOLOGY CO.,LTD
Web:wz-valve.en.made-in-china.com
Are you interested in learning more about Bellow Sealed Valve? Contact us today to secure an expert consultation!